Field work

Everyday life consists of surprises among other things.

This time the surprise was a rubble on the other side of the street, right in front of our house. This was not the case when I was signing the rental contract. It was not beautiful either, but what we found on our arrival frightened us that we would have to watch it every day.

There was no choice: we’ve got to hire a "professional" to remove the mess.

A small man with a hoe and a chipped shovel arrived on his machine, and he set to work. I guess he would not have been done by dark if it were not for me, and then Adek who have helped him in the loading.

It was not easy, but it was possible to achieve some effect after five hours (32 ° C) of work.

Now it's time for some soil and flowers.

We will be recording the following effects.

PS

Kamel is still hiding. Although we know his hiding place, we let him decide to come out and accept us.

Add comment
  • 12 May 2024 | Sunday 18:21 K&R
    Niech się schowają wszystkie seriale-Wasze kolejne doniesienia coraz ciekawsze -i w końcu to "reality show"! Jesteście niesamowici, nie dajecie mam wyjść z podziwu! A to zalewa Was "żółta rasa", to ginie kot, to jakiś" kret" zrobił Wam kopczyk koło domu!
    Co jeszcze???
    Wstrząśnięci ale nie zmieszani podziwiamy i pozdrawiamy serdecznie
    K&R